Heilig Kreuz is the closest church to that
Garzweiler II opencast mine falls victim

Today's church already had several previous buildings. In 1866 the eastern part of the last church building was demolished and replaced by a new choir.
It was not until 1912 to 1913 that today's three-aisled, neo-Gothic hall church was finally completed. Originally the building was supposed to have a double tower facade (as in Immerath), but only the southern west tower was completely built.
Around 2023, this church will be demolished due to the approaching Garzweiler opencast mine.






































Are you looking at the demolition of the church?
Alexander Tetzlaff is brother master of the St. Sebastianus Rifle Brotherhood Keyenberg. A historical task of the rifle brotherhood is the protection of the town and the church.
You can find further parts of the interview with Alexander Tetzlaff on the Location page Keyenberg.
Watch video from original provider
Alexander: To be honest, I don't know yet. I didn't look at it in Borschemich, I was studying there too, it was far too difficult because the information that it was happening often comes at very short notice. In Immerath I had a few hours free in the afternoon and then spontaneously went there. It was really cold, that was at the beginning of the year. Then I thought, you can handle it here, even though it was difficult, and I asked myself the question, will you do that in Keyenberg and I don't have an answer yet.
I don't know what the right thing is in the end. Sure, I'll see the pictures of it through the media anyway. There's no getting around it these days, even if I maybe didn't want to. On the other hand, I tell myself that I want to remember the church as it is now. I don't want to see the ruins or watch an excavator reach into it.
The new chapel of Keyenberg
In March 2018 the design for the new chapel for Keyenberg, Kuckum, Westrich and Berverath was presented. The design by the architects Dewey and Blohm-Schröder from Viersen incorporates parts of the old churches and chapels, and bricks from the old buildings may even be used.

Twelve villages will be demolished for opencast mining
Five villages have already been completely destroyed, one has almost nothing left and six others are currently being relocated. Two to three individual farms, the final mining limit is not yet entirely certain, will be relocated towards the end of the opencast mining.